Engineering reference

Cooling Tower Water Usage Calculator

Estimates evaporation, drift, blowdown and makeup-water demand from tower load and cycles of concentration.
Interactive calculator

Enter your project parameters below to calculate an indicative result.

Migrated from the TPCE engineering library
Important guidance

This calculator provides guidance and an engineering estimate only. It does not replace project-specific design, verification or professional engineering advice. Confirm inputs, assumptions and the applicable edition of each referenced standard before relying on a result.

Ask a TPCE engineer →