Engineering Exploration projects
Sector image · Engineering Exploration

Campsie, NSW

Canterbury Hospital — Multizone AHU VSD Retrofit

True Partners Consulting Engineers reviewed Canterbury Hospital’s existing multizone constant-air-volume air-handling units and developed a variable-speed-drive control strategy for the supply and return-air fans. The retrofit was designed to reduce energy use while maintaining the pressure, temperature and ventilation conditions required in an occupied healthcare environment.