RETAIL

Bavarian Beer Cafe- Rouse Hill

This brand new venue located opposite the cinemas in the Rouse Hill Town Centre. Project included full D&C design of the mechanical air conditioning and ventilation system including store ventilation and commercial kitchen exhaust system design. True Partners Consulting Engineers was engaged by the mechanical contractor to deliver mechanical design, shop drawings for construction, As Built drawings and O&M manual for mechanical services.




111 Phillip St, Parramatta

Refurbishment of 111 Phillip St, Parramatta for client Lipman Pty Ltd, The project consisted of the refurbishment of:

The Ground Floor and Mezzanine Lobby;

External façade works, and; New amenities.

Project included full design and documentation of mechanical services for three retails shops, amenities and lobby area. A separate kitchen exhaust system for each retail was considered with a single filtration facility that allowed horizontal discharge of the kitchen exhaust system through the carpark level external facade. 

Aldi Distribution Centres, NSW & QLD

True Partners Consulting Engineers delivered engineering documentation for upgrade of services for the administration and produce storage buildings with focus on efficiency upgrade.


Petbarn and Greencross Vet National Design Standard

True Partners Consulting Engineers was engaged by client to develop national standard design documentation for the Petbarn stores and Greencross Vet clinics. Our engineers have successfully delivered design documentation for several Petbarn stores and Greencross clinics and animal hospital Australia wide. 

Wentworth Hotel, 195 Parramatta Rd, Homebush NSW

Hotel upgrade features new function rooms, sports bar, family dining, and kids play area. It also included air conditioned semi indoor gaming area with indoor smoking allowed. True Partners Consulting Engineers delivered mechanical engineering D&C documentation for the mechanical contractor. 

Baker Bleu, 2 Guilfoyle Ave, Double Bay NSW 2028

Cafe & Bakery upgrade features new commercial oven hoods and associated ventilation system with discharge at the roof level and provision for filtration system to assist with heat removal from the BOH Bakery. True Partners Consulting Engineers delivered mechanical engineering D&C documentation for the mechanical contractor.